British Province of The Unitas Fratum of the Moravian Church – Ockbrook School, The Settlement, Ockbrook, DE72 3RJ

Ockbrook School closed down in July 2021. It is likely that Over The Wall Charity otw.org.uk will shortly be taking a lease for the whole site. The charity will use the site as their main base and will also deliver activities for those they assist.

A sizeable amount of renovations and refurbishment will take place before the site becomes fully operational. the works will take up to 18 months and estimated cost is currently £ 250,000.

Construction and BDV Summary – Current BDV £ 22 million ( figure) corresponds to figure on the footage

The Grange (8)  £ 4,000,000 Masonry walls, Timber floors, Slate roof with small balcony with felt covering. Roof of extension is slate and clay pantile with one flat felt on timber section

Mount Building (9)   £ 5,000,000 2 properties- Main building has masonry walls, with and extension of steel frame, hollow rib metal deck with concrete slab floors, slate pitched roof and flat felt on timber roof. The second building “The Mews” has masonry walls, timber floors, and tile and slate roof with small flat roof with mineral felt covering

Main School (1) £ 7,200,000 Masonry walls, Timber floors, Slate. Roof of extension is slate with one flat felt on timber section, and there is a series of 6 flat roofs, 4 of which are felt on timber, and 2 have a single ply covering. Grade II listed

Biltill Hall (4) £ 1,000,000 3 buildings which are all internally linked- original building has brick walls with slate roof. The two additional buildings comprise cavity walls with outer brickwork. There are 2 flat roofs to the main hall and central building- one is mineral felt with patisol coated steel panel cladding, the other is covered in a single ply covering. need floor construction 

Science Block (5) £ 1,250,000 Masonry walls with slate pitched roof, floors

Mallalieu Centre (6) £1,000,000 Masonry walls, stale roof, timber floors

Sports Hall (7)  £1,000,000 Blockwork walls, tile roof and metal deck first floor

Swallows Rest (10)  £ 300,000 Brick walls with slate roof and timber floors

Lodge  £ 200,000 Slate roof, timber and concrete floors

Lily House  £ 500,000 Masonry walls with slate pitched roof, small section of flat roof, timber floors 

Broadstairs (2)  £ 500,000 Masonry with slate roof and timber floors

Music Hall (3) £ 50,000 The roof is pitched timber with ridge lines running east to west having a green mineral  felt finish. The porch has a lean-to corrugated fibre cement sheet roof likely to have asbestos content, The main structure is likely to be steel framed supporting the roof frame.

General Information

Bells only alarm on all buildings but The Lodge- Maintenance staff on site 5 days a week – A security company visits twice at night during the week and twice a day during weekend, member of maintenance staff on call every weekend – Surrounding properties are residential and occupied – Swallows Rest is used currently as site office – Site manager has worked at school for 20 years – No claims – Minimal issues with trespassing.

Additional Information

Please find four links to supporting documents that combined provide many photos of which a significant amount are internal, additional construction details, summary of the works required and site plan.